Do I need a separate permit for a paver driveway or walkway in Yakima?
Sometimes, depending on where it runs and how big it is. Work in the city's right of way, usually the strip along the street with the sidewalk and curb, needs its own permit, and the city's Engineering Division information covers it. A project that adds more than 5,000 square feet of new hard surface also needs a stormwater permit application with drainage calculations from a licensed engineer, though most home driveways and walkways come in well under that.





